Over 1 Million Paying Vacancies Available. Discover Your Dream Vacancy with Us!

Are you looking for a Earned Value Management Specialist? We suggest you consider a direct vacancy at Defense Contract Management Agency in El Segundo. The page displays the terms, salary level, and employer contacts Defense Contract Management Agency person

Job opening: Earned Value Management Specialist

Salary: $102 214 - 156 323 per year
Published at: Apr 08 2024
Employment Type: Full-time
See below for important information regarding this job. Additional vacancies may be filled from this announcement.

Duties

Responsible for surveillance of the contractors EVMS system (s) and insures that Program Support Teams (PST) possess the necessary tools, training, and EVM understanding to provide valuable analysis. Evaluates contractor EVM System changes to ensure compliance with EVM guidelines, and recommends approval or disapproval to the Defense Corporate Executive (DCE). Assesses the cost, schedule, and performance risk assessments associated with the key EVM System processes and documents risk assessments (i.e., RAMP). Works with the contractor and DCAA to establish and execute Joint Surveillance Plans (JSP), and also conducts separate, independent validation reviews. Develops and utilizes DCMA tools such as CPR quality rating system tool to objectively evaluate the quality of the contractors' performance report to CDRL requirement. Communicates EVM system status information and various surveillance results to the PMO(s) through local PI(s) or PST(s) and to the DCE. Serves as the CMOs point of contact (POC) for all EVM matters at assigned contractors.

Requirements

  • Must be a U.S. citizen
  • Security Requirements: Special Sensitive requiring incumbent to obtain a Top Secret, Sensitive Compartmented Information (SCI) security access
  • Appointment is subject to the completion of a favorable suitability or fitness determination, where reciprocity cannot be applied; unfavorably adjudicated background checks will be grounds for removal.
  • Selective Service Requirement: Males born after 12-31-59 must be registered or exempt from Selective Service.

Qualifications

To qualify for a Earned Value Management Specialist, your resume and supporting documentation must support: Specialized Experience: One year of specialized experience that equipped you with the competencies to successfully perform the duties of the position and is directly in, or related to, this position. To qualify for the NH-03 level, specialized experience must be at the NH-02 or GS-11 grade level or equivalent under other pay systems in the Federal service, military or private sector. Applicants must meet eligibility requirements including minimum qualifications, and any other regulatory requirements by the cut-off/closing date of the announcement. Creditable specialized experience includes: 1. Assure that cost, schedule, and contract-related financial and program status reports are timely, accurate, and depict actual conditions. 2. Distribute the workload and tasks among the employees in accordance with established work flow, skill level and/or occupational specialization. 3. Provide recommendations to the Team Supervisor regarding administrative and technical training that may be required. 4. Monitor and report on the status and progress of work, checking the work in progress and upon completion to ensure instructions and deadlines have been met.5. Maintain program and administrative reference materials, project files and relevant background documents and makes available policies, procedures and written instructions.

Education

Substitution of education may not be used in lieu of specialized experience for this grade level.

Contacts

  • Address DEFENSE CONTRACT MGT - SPECIAL PROGRAMS 3901 A Ave Bldg 10500 Fort Gregg-Adams, VA 23801 US
  • Name: DHRSSTAFFING DCMA HQ
  • Phone: 614-692-2048
  • Email: [email protected]

Map

Similar vacancies

Deputy Director, AtlasX Jul 19 2024
$142 094 - 191 900

The United States Space Force (USSF) Space Systems Command (SSC) at Los Angeles Air Force Base is searching for a Deputy Director, AtlasX (NH-1101-04, GS 14/15 Equivalent). AtlasX: AtlasX is a forwar...

Deputy Director, Electromagnetic Warfare Systems Delta Sep 06 2024
$142 094 - 191 900

The United States Space Force (USSF) Space Systems Command (SSC) at Los Angeles Air Force Base is searching for a Deputy Director, Electromagnetic Warfare Systems Delta (NH-1101-04, GS 14/15 Equivalen...

Materiel Leader PTSR PTSG and GPS IIIF Program Manager Apr 08 2024
$142 094 - 191 900

The United States Space Force (USSF) at Los Angeles Space Force Base is searching for Materiel Leaders for PTS-R, PTS-G, and GPS IIIF (NH-1101-04, GS 14/15 equivalent). Description: At the United Sta...

Deputy Director, Space Domain Awareness and Combat Power May 22 2024
$142 094 - 191 900

The United States Space Force (USSF) Space Systems Command (SSC) at Los Angeles Air Force Base is searching for a Deputy Director, Space Domain Awareness and Combat Power (NH-1101-04). Description: ...

Future Systems Program Manager Feb 23 2024
$142 094 - 191 900

The United States Space Force (USSF) at the Los Angeles AFB is searching for a Future Systems Program Manager, SZA (NH-1101-04, GS14/15 equivalent). Description: Come be a part of the United States S...